Top Labelling Machine
Labels the top surface of flat products: cartons, boxes, trays, containers and pouches. Servo PLC control, with a printer added for batch and expiry coding.
- Speed
- 40-240/min
- Label size
- 25-250 mm
- Power
- 1.5 kW

Specifications
Speeds depend on your container and label size. We confirm the figures for your line in writing.
| Speed | 40 to 240 per minute (product dependent) |
|---|---|
| Label roll outer diameter | 280 mm |
| Label material | Paper, film, PP, PE |
| Label size | Min. 25 × 25 mm, max. 250 × 250 mm |
| Construction | SS304 (SS316 optional) |
| Power supply | 220 VAC, 50 Hz, single phase |
| Power consumption | 1.5 kW |
| Control system | Servo PLC with touch-screen HMI |
| Machine size | As per model |
| Weight | Approx. 250 kg |
| Printer integration | CIJ / TIJ / TTO compatible |
| Optional | Shroud, extension conveyor |
Acuron Automation Systems Pvt. Ltd. · Plot No. R-798, Mahape MIDC, Navi Mumbai 400710 · 022 4574 4934 · Sales@acuronautomation.com · acuronautomation.com
Features
Standard
- Servo PLC with touch-screen HMI
- SS304 construction
- Printer-ready for batch and expiry coding
Optional
- SS316 construction
- Shroud
- Extension conveyor
Applications
Questions
How fast is the Top Labelling Machine?
40 to 240 per minute (product dependent). The actual speed depends on your container and label size, so we confirm it in writing once we have seen your pack.
What label sizes does it take?
Min. 25 × 25 mm, max. 250 × 250 mm.
Which label materials can it run?
Paper, film, PP, PE.
Can it print batch numbers and expiry dates?
Yes. CIJ / TIJ / TTO compatible printing can be integrated, so batch, expiry and barcodes are coded on the line.
What is it made of?
SS304 (SS316 optional).
Where is it made, and who services it?
It is designed and built at our plant in Mahape MIDC, Navi Mumbai. Installation, training and spare parts are handled by our service centres in Mumbai, Pune, Delhi, Hyderabad and Chandigarh.
Get a quote for the Top Labelling Machine.
Tell us your container, label and line speed. An engineer replies within one working day, and before dispatch your own containers run on the finished machine at our Mahape plant.
